76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
80 lines
3.6 KiB
Markdown
80 lines
3.6 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "43 U.S.C. § 2402"
|
||
description: "Rural water supply program"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 43
|
||
title_name: "PUBLIC LANDS"
|
||
chapter_number: "42"
|
||
chapter_name: "RURAL WATER SUPPLY"
|
||
section: "2402"
|
||
citation: "43 U.S.C. § 2402"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip"
|
||
source_identifier: "/us/usc/t43/s2402"
|
||
source_file: "data/legal/raw/us/code/title-43/usc43.xml"
|
||
source_hash: "bd0661fd3dd8753fea36ef798e48071d0d2cab1fc12f9df3b95acff4ffb10788"
|
||
raw_snapshot_hash: "d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f"
|
||
text_hash: "17cb4e1755a84a93a33a6cc53352a6e2b90b10e421d6bfa4527b42ae71cc4204"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 43 U.S.C. § 2402 - Rural water supply program
|
||
|
||
## Text
|
||
|
||
(a) In general The Secretary, in cooperation with non-Federal project entities and consistent with this subchapter, may carry out a rural water supply program in Reclamation States to—
|
||
|
||
(1) investigate and identify opportunities to ensure safe and adequate rural water supply projects for domestic, municipal, and industrial use in small communities and rural areas of the Reclamation States;
|
||
|
||
(2) plan the design and construction, through the conduct of appraisal investigations and feasibility studies, of rural water supply projects in Reclamation States; and
|
||
|
||
(3) oversee, as appropriate, the construction of rural water supply projects in Reclamation States that are recommended by the Secretary in a feasibility report developed pursuant to section 2405 of this title and subsequently authorized by Congress.
|
||
|
||
(b) Non-Federal project entity Any activity carried out under this subchapter shall be carried out in cooperation with a qualifying non-Federal project entity, consistent with this subchapter.
|
||
|
||
(c) Eligibility criteria Not later than 1 year after December 22, 2006, the Secretary shall, consistent with this subchapter, develop and publish in the Federal Register criteria for—
|
||
|
||
(1) determining the eligibility of a rural community for assistance under the Program; and
|
||
|
||
(2) prioritizing requests for assistance under the Program.
|
||
|
||
(d) Factors The criteria developed under subsection (c) shall take into account such factors as whether—
|
||
|
||
(1) a rural water supply project—
|
||
|
||
(A) serves—
|
||
|
||
(i) rural areas and small communities; or
|
||
|
||
(ii) Indian tribes; or
|
||
|
||
(B) promotes and applies a regional or watershed perspective to water resources management;
|
||
|
||
(2) there is an urgent and compelling need for a rural water supply project that would—
|
||
|
||
(A) improve the health or aesthetic quality of water;
|
||
|
||
(B) result in continuous, measurable, and significant water quality benefits; or
|
||
|
||
(C) address current or future water supply needs;
|
||
|
||
(3) a rural water supply project helps meet applicable requirements established by law; and
|
||
|
||
(4) a rural water supply project is cost effective.
|
||
|
||
(e) Inclusions The Secretary may include—
|
||
|
||
(1) to the extent that connection provides a reliable water supply, a connection to pre-existing infrastructure (including impoundments and conveyance channels) as part of a rural water supply project; and
|
||
|
||
(2) notwithstanding the limitation on population under section 2401(9)(A) of this title, a town or community with a population in excess of 50,000 inhabitants in an area served by a rural water supply project if, at the discretion of the Secretary, the town or community is considered to be a critical partner in the rural supply project.
|
||
|
||
(Pub. L. 109–451, title I, § 103, Dec. 22, 2006, 120 Stat. 3347.)
|