Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via Atlas depot), ingested with the standard pipeline: raw snapshot -> per-section OKF markdown -> manifest + checksums. Title 52 untouched. LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
3.1 KiB
type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
| type | title | description | jurisdiction | corpus | kind | title_number | title_name | chapter_number | chapter_name | section | citation | status | release_point | release_date | source | source_url | source_identifier | source_file | source_hash | raw_snapshot_hash | text_hash | retrieved_at | confidence | tags | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LegalText | 10 U.S.C. § 6115 | Major warhead refurbishment program | us | united_states_code | code_section | 10 | ARMED FORCES | 602 | NUCLEAR WEAPONS STOCKPILE MATTERS | 6115 | 10 U.S.C. § 6115 | current | 119-100 | 2026-06-26 | official | https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip | /us/usc/t10/s6115 | data/legal/raw/us/code/title-10/usc10.xml | 4b44f48d2ce559fb1ad7e6108981b8629878d0e3fc6c34dc4dbfb4975696cea0 | 06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1 | 7e105f494a6819d45244740ac6412d1c2fafc57c4ad90fbe5734ea6fdd3619d7 | 2026-07-04 | official |
|
10 U.S.C. § 6115 - Major warhead refurbishment program
Text
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
(1) a full description of alternatives considered prior to the award of Phase 6.3;
(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
(Added Pub. L. 119–60, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1352.)
Notes
Editorial Notes
Prior ProvisionsA prior section 6115, act Aug. 10, 1956, ch. 1041, 70A Stat. 382, prescribed a time limit for filing claims for drill pay and for the uniform gratuity. Section was also amended by Pub. L. 85–861, § 33(a)(31), which amended catchline by substituting “uniform gratuity” for “unform gratuity”, prior to repeal by Pub. L. 85–861, § 36B(17), Sept. 2, 1958, 72 Stat. 1571. Provisions similar to those in this section were contained in section 2523c of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, § 3111(b)(3).