Files
republic-os/legal/us/code/title-10/chapter-602/section-6115.md
T
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

54 lines
3.1 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "10 U.S.C. § 6115"
description: "Major warhead refurbishment program"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 10
title_name: "ARMED FORCES"
chapter_number: "602"
chapter_name: "NUCLEAR WEAPONS STOCKPILE MATTERS"
section: "6115"
citation: "10 U.S.C. § 6115"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip"
source_identifier: "/us/usc/t10/s6115"
source_file: "data/legal/raw/us/code/title-10/usc10.xml"
source_hash: "4b44f48d2ce559fb1ad7e6108981b8629878d0e3fc6c34dc4dbfb4975696cea0"
raw_snapshot_hash: "06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1"
text_hash: "7e105f494a6819d45244740ac6412d1c2fafc57c4ad90fbe5734ea6fdd3619d7"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 10 U.S.C. § 6115 - Major warhead refurbishment program
## Text
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
(1) a full description of alternatives considered prior to the award of Phase 6.3;
(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
(Added Pub. L. 11960, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1352.)
## Notes
Editorial Notes
Prior ProvisionsA prior section 6115, act Aug. 10, 1956, ch. 1041, 70A Stat. 382, prescribed a time limit for filing claims for drill pay and for the uniform gratuity. Section was also amended by Pub. L. 85861, § 33(a)(31), which amended catchline by substituting “uniform gratuity” for “unform gratuity”, prior to repeal by Pub. L. 85861, § 36B(17), Sept. 2, 1958, 72 Stat. 1571. Provisions similar to those in this section were contained in section 2523c of Title 50, War and National Defense, prior to repeal by Pub. L. 11960, § 3111(b)(3).