00a184bb3c
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via Atlas depot), ingested with the standard pipeline: raw snapshot -> per-section OKF markdown -> manifest + checksums. Title 52 untouched. LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
98 lines
5.1 KiB
Markdown
98 lines
5.1 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "10 U.S.C. § 6135"
|
||
description: "W93 nuclear warhead acquisition process"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 10
|
||
title_name: "ARMED FORCES"
|
||
chapter_number: "602"
|
||
chapter_name: "NUCLEAR WEAPONS STOCKPILE MATTERS"
|
||
section: "6135"
|
||
citation: "10 U.S.C. § 6135"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip"
|
||
source_identifier: "/us/usc/t10/s6135"
|
||
source_file: "data/legal/raw/us/code/title-10/usc10.xml"
|
||
source_hash: "6350a66de315cc6c73f63d0a870bbb1584f3a9df527b6ac22c641b389c334e06"
|
||
raw_snapshot_hash: "06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1"
|
||
text_hash: "8993219725f84a3ed0b47b59baf186cc711af05ab2a9e3abfb6844104448e8ab"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 10 U.S.C. § 6135 - W93 nuclear warhead acquisition process
|
||
|
||
## Text
|
||
|
||
(a) Reporting Requirements.— (1) Upon receiving a concept definition study under phase 1 of the joint nuclear weapons life cycle for the W93 nuclear weapon, the Nuclear Weapons Council shall submit to the congressional defense committees a report that includes the following:
|
||
|
||
(A) A description of the potential military characteristics of the weapon.
|
||
|
||
(B) A description of the stockpile-to-target sequence requirements of the weapon.
|
||
|
||
(C) An initial assessment of the requirements a W93 nuclear weapon program is likely to generate for the nuclear security enterprise, including—
|
||
|
||
(i) adjustments to the size and composition of the workforce;
|
||
|
||
(ii) additions to existing weapon design and production capabilities; or
|
||
|
||
(iii) additional facility recapitalization or new construction.
|
||
|
||
(D) A preliminary description of other significant requirements for a W93 nuclear weapon program, including—
|
||
|
||
(i) first production unit date;
|
||
|
||
(ii) initial operational capability date;
|
||
|
||
(iii) full operational capability date; and
|
||
|
||
(iv) any unique safety and surety requirements that could increase design complexity or cost estimate uncertainty.
|
||
|
||
(2) (A) Not later than 15 days after the date on which the Nuclear Weapons Council approves phase 2 of the joint nuclear weapons life cycle for the W93 nuclear weapon, the Administrator shall provide to the congressional defense committees a briefing on a plan to implement a process of independent peer review or review by a board of experts, or both, with respect to—
|
||
|
||
(i) the nonnuclear components of the weapon;
|
||
|
||
(ii) subsystem design; and
|
||
|
||
(iii) engineering aspects of the weapon.
|
||
|
||
(B) The Administrator shall ensure that the process required by subparagraph (A)—
|
||
|
||
(i) uses—
|
||
|
||
(I) all relevant capabilities of the Federal Government, the defense industrial base, and institutions of higher education; and
|
||
|
||
(II) other capabilities that the Administrator determines necessary; and
|
||
|
||
(ii) informs the entire development life cycle of the W93 nuclear weapon.
|
||
|
||
(b) Certifications and Reports at Phase 3.— Not later than 15 days after the date on which the Nuclear Weapons Council approves phase 3 of the joint nuclear weapons life cycle for the W93 nuclear weapon—
|
||
|
||
(1) the administrator shall provide to the congressional defense committees a briefing that includes certifications that—
|
||
|
||
(A) phases 1 through 5 of the joint nuclear weapons life cycle for the weapon will employ, at a minimum, the same best practices and will provide Congress with the same level of programmatic insight as exists under the phase 6.X process for life extension programs; and
|
||
|
||
(B) the proposed design for the weapon can be carried out within estimated schedule and cost objectives; and
|
||
|
||
(2) the Commander of the United States Strategic Command shall submit to the congressional defense committees a report containing, or provide to such committees a briefing on, the requirements for weapon quantity and composition by type for the sub-surface ballistic nuclear (SSBN) force, including such requirements planned for the 15-year period following the date of the report or briefing, as the case may be, including any planned life extensions, retirements, or alterations.
|
||
|
||
(c) Waivers.— Subsections (a) and (b) may be waived during a period of war declared by Congress after January 1, 2021.
|
||
|
||
(d) Joint Nuclear Weapons Life Cycle Defined.— In this section, the term “joint nuclear weapons life cycle” has the meaning given that term in section 6131.
|
||
|
||
(Added and amended Pub. L. 119–60, div. C, title XXXI, § 3111(a), (d)(2), Dec. 18, 2025, 139 Stat. 1370, 1462.)
|
||
|
||
## Notes
|
||
|
||
Editorial Notes
|
||
|
||
Prior ProvisionsProvisions similar to those in this section were contained in section 2538e of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, § 3111(b)(1).
|
||
|
||
Amendments2025—Pub. L. 119–60, § 3111(d)(2)(B), realigned margins. Subsec. (a)(1). Pub. L. 119–60, § 3111(d)(2)(A), struck out par. (1) heading which read as follows: “Phase 1”. Subsec. (a)(2). Pub. L. 119–60, § 3111(d)(2)(A), struck out headings for par. (2) “Phase 2” and subpars. (A) and (B) “In general” and “Requirements for process”, respectively.
|