Files
republic-os/legal/us/code/title-14/chapter-9/section-913.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

50 lines
2.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "14 U.S.C. § 913"
description: "Turnkey selection procedures"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 14
title_name: "COAST GUARD"
chapter_number: "9"
chapter_name: "ADMINISTRATION"
section: "913"
citation: "14 U.S.C. § 913"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc14@119-100.zip"
source_identifier: "/us/usc/t14/s913"
source_file: "data/legal/raw/us/code/title-14/usc14.xml"
source_hash: "e4cbddfd974226410c8a65750776bec0357997e5be9ce39ce787b568dd207c18"
raw_snapshot_hash: "0a287809467d795ac0e1a72d6743ea6b1d340c0f74c77c67bfeba10724006304"
text_hash: "0f481396940c615083f41a9d525e5b0ea639e6460e4423065f71785b4a2c89ab"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 14 U.S.C. § 913 - Turnkey selection procedures
## Text
(a) Authority to Use.— The Secretary may use one-step turnkey selection procedures for the purpose of entering into contracts for construction projects.
(b) Definitions.— In this section, the following definitions apply:
(1) The term “one-step turnkey selection procedures” means procedures used for the selection of a contractor on the basis of price and other evaluation criteria to perform, in accordance with the provisions of a firm fixed-price contract, both the design and construction of a facility using performance specifications supplied by the Secretary.
(2) The term “construction” includes the construction, procurement, development, conversion, or extension of any facility.
(3) The term “facility” means a building, structure, or other improvement to real property.
(Added Pub. L. 109241, title II, § 205(a), July 11, 2006, 120 Stat. 521, § 677; renumbered § 913, Pub. L. 115282, title I, § 107(b), Dec. 4, 2018, 132 Stat. 4205.)
## Notes
Editorial Notes
Amendments2018—Pub. L. 115282 renumbered section 677 of this title as this section.