76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
42 lines
2.0 KiB
Markdown
42 lines
2.0 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "16 U.S.C. § 836a"
|
||
description: "Rules governing issuance of license"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 16
|
||
title_name: "CONSERVATION"
|
||
chapter_number: "12E"
|
||
chapter_name: "NIAGARA POWER PROJECT"
|
||
section: "836a"
|
||
citation: "16 U.S.C. § 836a"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip"
|
||
source_identifier: "/us/usc/t16/s836a"
|
||
source_file: "data/legal/raw/us/code/title-16/usc16.xml"
|
||
source_hash: "721acec36d98b0988e5c351454df2857bc76576f152cc0727dd7073ffcefe5e4"
|
||
raw_snapshot_hash: "7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503"
|
||
text_hash: "c3f5177c1cd7d8c8f59fb721033b2af5495d09e971d29bc6a79b35c8fdc988b1"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 16 U.S.C. § 836a - Rules governing issuance of license
|
||
|
||
## Text
|
||
|
||
The license issued under the terms of this chapter shall be granted in conformance with Rules of Practice and Procedure of the Federal Energy Regulatory Commission, but in the event of any conflict, the provisions of this chapter shall govern in respect of the project herein authorized.
|
||
|
||
(Pub. L. 85–159, § 2, Aug. 21, 1957, 71 Stat. 402; Pub. L. 95–91, title IV, § 402(a)(1)(A), Aug. 4, 1977, 91 Stat. 583.)
|
||
|
||
## Notes
|
||
|
||
Statutory Notes and Related Subsidiaries
|
||
|
||
Transfer of Functions “Federal Energy Regulatory Commission” substituted for “Federal Power Commission” in subsecs. (a) and (b) pursuant to Pub. L. 95–91, § 402(a)(1)(A), which is classified to section 7172(a)(1)(A) of Title 42, The Public Health and Welfare. The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by sections 7151(b), 7171(a), 7172(a), 7291, and 7293 of Title 42.
|