Files
republic-os/legal/us/code/title-33/chapter-12/section-562.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

46 lines
3.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "33 U.S.C. § 562"
description: "Channel depths and dimensions defined"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 33
title_name: "NAVIGATION AND NAVIGABLE WATERS"
chapter_number: "12"
chapter_name: "RIVER AND HARBOR IMPROVEMENTS GENERALLY"
section: "562"
citation: "33 U.S.C. § 562"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip"
source_identifier: "/us/usc/t33/s562"
source_file: "data/legal/raw/us/code/title-33/usc33.xml"
source_hash: "ae5a10e4470e8246c7645996b45faeb621bc97b030d57db270c5959e20e04ed1"
raw_snapshot_hash: "de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523"
text_hash: "b53d156916dd7db41d37f4aaa6f6c587b0336ebe2b56c760942a37e37714a0a7"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 33 U.S.C. § 562 - Channel depths and dimensions defined
## Text
In the preparation of projects under this and subsequent river and harbor acts and after the project becomes operational, unless otherwise expressed, the channel depths referred to shall be understood to signify the depth at mean lower low water, as defined by the Department of Commerce for nautical charts and tidal predictions, in tidal waters tributary to the Atlantic and Gulf coasts and at mean lower low water, as defined by the Department of Commerce for nautical charts and tidal predictions, in tidal waters tributary to the Pacific coast and the mean depth for a continuous period of fifteen days of the lowest water, as defined by the Department of Commerce for nautical charts and tidal predictions, in the navigation season of any year in rivers and nontidal channels, and and 11 So in original. after the project becomes operational the channel dimensions specified shall be understood to admit of such increase at the entrances, bends, sidings, and turning places as may be necessary to allow of the free movement of boats.
(Mar. 4, 1915, ch. 142, § 5, 38 Stat. 1053; Pub. L. 102580, title II, § 224, Oct. 31, 1992, 106 Stat. 4837.)
## Notes
Editorial Notes
Codification Section is from act Mar. 4, 1915, popularly known as the “Rivers and Harbors Appropriation Act of 1915”.
Prior ProvisionsSection superseded act Mar. 4, 1913, ch. 144, § 9, 37 Stat. 827, which read as follows: “In the preparation of projects under this and subsequent river and harbor acts, unless otherwise expressed, the channel depths referred to shall be understood to signify the depth at mean lower low water in tidal waters, and the mean depth during the month of lowest water in the navigation season in rivers and nontidal channels, and the channel dimensions specified shall be understood to admit of such increase at the entrances, bends, sidings, and turning places as may be necessary to allow of the free movement of boats.”
Amendments1992—Pub. L. 102580 inserted “and after the project becomes operational” after “harbor acts”, “lower” after “depth at mean”, “, as defined by the Department of Commerce for nautical charts and tidal predictions,” after “water” wherever appearing, and “and after the project becomes operational” before “the channel dimensions”.