Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2.4 KiB
type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
| type | title | description | jurisdiction | corpus | kind | title_number | title_name | chapter_number | chapter_name | section | citation | status | release_point | release_date | source | source_url | source_identifier | source_file | source_hash | raw_snapshot_hash | text_hash | retrieved_at | confidence | tags | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LegalText | 33 U.S.C. § 2213a | Treatment of certain benefits and costs | us | united_states_code | code_section | 33 | NAVIGATION AND NAVIGABLE WATERS | 36 | WATER RESOURCES DEVELOPMENT | 2213a | 33 U.S.C. § 2213a | current | 119-100 | 2026-06-26 | official | https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip | /us/usc/t33/s2213a | data/legal/raw/us/code/title-33/usc33.xml | d4e1be64876229b167d52f470c58e08aa87605fa9d7874e9d4dda1d2e006de9b | de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523 | 63b410df8752819c100c9112339674cf9fd9b7f4e51701e5c49dc41e7fe225cf | 2026-07-04 | official |
|
33 U.S.C. § 2213a - Treatment of certain benefits and costs
Text
(a) In general In the case of a flood risk management or coastal storm risk management project in a region of moderate or high seismic hazard, for the purpose of a benefit-cost analysis for the project, the Secretary shall not include in that analysis any additional design and construction costs resulting from addressing seismic concerns.
(b) Savings provision Except with respect to the benefit-cost analysis, the additional costs referred to in subsection (a) shall be—
(1) included in the total project cost; and
(2) subject to cost-share requirements otherwise applicable to the project.
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27, 2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Notes
Editorial Notes
Codification Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
Amendments2022—Subsec. (a). Pub. L. 117–263 substituted “a flood risk management or coastal storm risk management project in a region” for “flood risk management project that incidentally generates seismic safety benefits in regions”.
Statutory Notes and Related Subsidiaries
“Secretary” Defined Secretary means the Secretary of the Army, see section 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title.