76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
54 lines
2.4 KiB
Markdown
54 lines
2.4 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "33 U.S.C. § 2213a"
|
||
description: "Treatment of certain benefits and costs"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 33
|
||
title_name: "NAVIGATION AND NAVIGABLE WATERS"
|
||
chapter_number: "36"
|
||
chapter_name: "WATER RESOURCES DEVELOPMENT"
|
||
section: "2213a"
|
||
citation: "33 U.S.C. § 2213a"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip"
|
||
source_identifier: "/us/usc/t33/s2213a"
|
||
source_file: "data/legal/raw/us/code/title-33/usc33.xml"
|
||
source_hash: "d4e1be64876229b167d52f470c58e08aa87605fa9d7874e9d4dda1d2e006de9b"
|
||
raw_snapshot_hash: "de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523"
|
||
text_hash: "63b410df8752819c100c9112339674cf9fd9b7f4e51701e5c49dc41e7fe225cf"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 33 U.S.C. § 2213a - Treatment of certain benefits and costs
|
||
|
||
## Text
|
||
|
||
(a) In general In the case of a flood risk management or coastal storm risk management project in a region of moderate or high seismic hazard, for the purpose of a benefit-cost analysis for the project, the Secretary shall not include in that analysis any additional design and construction costs resulting from addressing seismic concerns.
|
||
|
||
(b) Savings provision Except with respect to the benefit-cost analysis, the additional costs referred to in subsection (a) shall be—
|
||
|
||
(1) included in the total project cost; and
|
||
|
||
(2) subject to cost-share requirements otherwise applicable to the project.
|
||
|
||
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27, 2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
|
||
|
||
## Notes
|
||
|
||
Editorial Notes
|
||
|
||
Codification Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
|
||
|
||
Amendments2022—Subsec. (a). Pub. L. 117–263 substituted “a flood risk management or coastal storm risk management project in a region” for “flood risk management project that incidentally generates seismic safety benefits in regions”.
|
||
|
||
Statutory Notes and Related Subsidiaries
|
||
|
||
“Secretary” Defined Secretary means the Secretary of the Army, see section 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title.
|