76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
56 lines
3.2 KiB
Markdown
56 lines
3.2 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "42 U.S.C. § 18324"
|
||
description: "Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 42
|
||
title_name: "THE PUBLIC HEALTH AND WELFARE"
|
||
chapter_number: "159"
|
||
chapter_name: "SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE"
|
||
section: "18324"
|
||
citation: "42 U.S.C. § 18324"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip"
|
||
source_identifier: "/us/usc/t42/s18324"
|
||
source_file: "data/legal/raw/us/code/title-42/usc42.xml"
|
||
source_hash: "890ac74281b9f3c5bd4afc63ec5a7d798d46e0f805c37db7da60ddd8220861fd"
|
||
raw_snapshot_hash: "644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e"
|
||
text_hash: "e4c4600c2501590d08bc30144aeeaa70fca3f5206fdb33e875d61e05d9db8d5e"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 42 U.S.C. § 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle
|
||
|
||
## Text
|
||
|
||
(a) In general In developing the Space Launch System pursuant to section 18322 of this title and the multi-purpose crew vehicle pursuant to section 18323 of this title, the Administrator shall, to the extent practicable utilize—
|
||
|
||
(1) existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—
|
||
|
||
(A) space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and
|
||
|
||
(B) Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and
|
||
|
||
(2) associated testing facilities, either in being or under construction as of October 11, 2010.
|
||
|
||
(b) Discharge of requirements In meeting the requirements of subsection (a), the Administrator—
|
||
|
||
(1) shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;
|
||
|
||
(2) shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;
|
||
|
||
(3) shall complete construction and activation of the A–3 test stand with a completion goal of September 30, 2013;
|
||
|
||
(4) may procure, develop, and flight test applicable components; and
|
||
|
||
(5) shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.
|
||
|
||
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124 Stat. 2816.)
|