Files
republic-os/legal/us/code/title-43/chapter-12b/section-620a-1.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

42 lines
2.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "43 U.S.C. § 620a1"
description: "Construction of participating projects to be concurrent with Central Arizona Project"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 43
title_name: "PUBLIC LANDS"
chapter_number: "12B"
chapter_name: "COLORADO RIVER STORAGE PROJECT"
section: "620a1"
citation: "43 U.S.C. § 620a1"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip"
source_identifier: "/us/usc/t43/s620a1"
source_file: "data/legal/raw/us/code/title-43/usc43.xml"
source_hash: "a55d5c6ed8dc6c070de042110546443b929f3cfbef25fd32fac5251b1746dc6c"
raw_snapshot_hash: "d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f"
text_hash: "dcfe13525c08886e343683e56ec149e8f03ea81be91f02bffd4393a4afea9a3d"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 43 U.S.C. § 620a1 - Construction of participating projects to be concurrent with Central Arizona Project
## Text
The Secretary is directed to proceed as nearly as practicable with the construction of the Animas-La Plata, Dolores, Dallas Creek, West Divide, and San Miguel participating Federal reclamation projects concurrently with the construction of the Central Arizona Project, to the end that such projects shall be completed not later than the date of the first delivery of water from said Central Arizona Project: Provided, That an appropriate repayment contract for each of said participating projects shall have been executed as provided in section 620c of this title before construction shall start on that particular project.
(Pub. L. 90537, title V, § 501(b), Sept. 30, 1968, 82 Stat. 897.)
## Notes
Editorial Notes
Codification Section consists of subsec. (b) of section 501 of Pub. L. 90537. Subsecs. (a), (d), and (e) of section 501 are classified to sections 620, 620 note, 620a, 620a2, 620c1, and 620k note of this title. Subsec. (c) and (f) of section 501 are not classified to the Code. Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter.