Files
republic-os/legislation/us/states/ca/20112012/ab-2514.md
T
2026-07-06 17:28:36 -04:00

94 lines
7.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "Bill"
title: "Net energy metering."
description: "Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law, relative to private energy producers, requires every electric utility, as defined, to make available to an eligible customer-generator, as defined, a standard contract or tariff for net energy metering on a first-come-first-served basis until the time that the total rated generating capacity of renewable electrical generation facilities, as defined, used by eligible customer-generators exceeds 5% of the electric utility's aggregate customer peak demand. The existing definition of an eligible customer-generator requires that the generating facility use a solar or wind turbine, or a hybrid system of both, and have a generating capacity of not more than one megawatt. Electrical corporations are an electric utility for these purposes."
jurisdiction: "us/states/ca"
legislature: "California Legislature"
session: "20112012"
identifier: "AB 2514"
citation: "California AB 2514 (20112012)"
classification: ["bill"]
subjects: ["Net energy metering."]
status: "enacted"
primary_sponsors: ["Bradford"]
version_count: 7
action_count: 25
vote_count: 7
first_action: "2012-02-24"
last_action: "2012-09-27"
source: "openstates"
source_identifier: "ocd-bill/1214a5e3-aba5-422b-99c2-834a97a95e78"
source_url: "http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201120120AB2514"
source_hash: "356a438bf3ac6219672c4a0c95e01ead40dfd92029162bb0a2109207c2872fb1"
vintage: "2026-07-01"
source_snapshot: "https://data.openstates.org/daily/2026-07-01/public.pgdump"
retrieved_at: "2026-07-06"
confidence: "reported"
tags: ["legislation", "bill", "us-ca"]
---
# California AB 2514 (20112012) — Net energy metering.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law, relative to private energy producers, requires every electric utility, as defined, to make available to an eligible customer-generator, as defined, a standard contract or tariff for net energy metering on a first-come-first-served basis until the time that the total rated generating capacity of renewable electrical generation facilities, as defined, used by eligible customer-generators exceeds 5% of the electric utility's aggregate customer peak demand. The existing definition of an eligible customer-generator requires that the generating facility use a solar or wind turbine, or a hybrid system of both, and have a generating capacity of not more than one megawatt. Electrical corporations are an electric utility for these purposes.
## Version chain
The bill's text revisions, in order — the diff chain from filing to enrollment.
1. **02/24/12 - Introduced** (filed) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251499INT)
2. **05/01/12 - Amended Assembly** (committee substitute) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251498AMD)
3. **06/25/12 - Amended Senate** (committee substitute) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251497AMD)
4. **08/06/12 - Amended Senate** (committee substitute) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251496AMD)
5. **09/27/12 - Chaptered** (committee substitute) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251494CHP)
6. **AB2514** (committee substitute) — [source](http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201120120AB2514)
7. **08/31/12 - Enrolled** (enrolled) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120120AB2514&version=20110AB251495ENR)
## Votes
- Do pass as amended, and re-refer to the Committee on Appropriations. — **72** (pass) · upper
- Do pass. — **170** (pass) · lower
- AB 2514 BRADFORD Assembly Third Reading — **559** (pass) · lower
- 3rd Reading AB2514 Bradford By Price — **305** (pass) · upper
- Do pass as amended and be re-referred to the Committee on Appropriations. — **110** (pass) · lower
- AB 2514 BRADFORD Concurrence in Senate Amendments — **636** (pass) · lower
- Do pass. — **70** (pass) · upper
## Sponsors
- Bradford — primary (person)
## Timeline
The legislative action history — every referral, reading, and vote.
- **2012-02-24** Introduced. To print. `introduction`
- **2012-02-26** From printer. May be heard in committee March 27.
- **2012-02-27** Read first time. `reading-1`
- **2012-03-22** Referred to Com. on U. & C. `referral-committee`
- **2012-04-30** From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (April 16). `amendment-passage, committee-passage, committee-passage-favorable`
- **2012-05-01** Read second time and amended. `reading-2, reading-1, amendment-passage`
- **2012-05-02** Re-referred to Com. on APPR. `referral-committee`
- **2012-05-16** In committee: Set, first hearing. Referred to APPR. suspense file. `referral-committee`
- **2012-05-25** From committee: Do pass. (Ayes 17. Noes 0.) (May 25). `committee-passage, committee-passage-favorable`
- **2012-05-25** Read second time. Ordered to third reading. `reading-2, reading-1`
- **2012-05-31** Read third time. Passed. Ordered to the Senate. (Ayes 56. Noes 8. Page 5180.) `reading-3, reading-1, passage`
- **2012-06-04** In Senate. Read first time. To Com. on RLS. for assignment. `reading-1`
- **2012-06-14** Referred to Com. on RLS. `referral-committee`
- **2012-06-25** From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on RLS. `reading-2, amendment-introduction, reading-1, amendment-passage, referral-committee`
- **2012-06-27** Re-referred to Com. on E., U. & C. `referral-committee`
- **2012-08-06** From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 2.) (July 3). `amendment-passage, committee-passage, committee-passage-favorable`
- **2012-08-06** Read second time and amended. Re-referred to Com. on APPR. `reading-2, reading-1, amendment-passage, referral-committee`
- **2012-08-07** From committee: Do pass. (Ayes 7. Noes 0.) (August 6). `committee-passage, committee-passage-favorable`
- **2012-08-08** Read second time. Ordered to third reading. `reading-2, reading-1`
- **2012-08-20** Read third time. Passed. Ordered to the Assembly. (Ayes 30. Noes 5. Page 4577.). `reading-3, reading-1, passage`
- **2012-08-22** In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 24 pursuant to Assembly Rule 77.
- **2012-08-27** Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 63. Noes 6. Page 6322.). `committee-passage-favorable, amendment-passage`
- **2012-09-10** Enrolled and presented to the Governor at 11:25 a.m.
- **2012-09-27** Approved by the Governor. `executive-signature`
- **2012-09-27** Chaptered by Secretary of State - Chapter 609, Statutes of 2012.
## Source
OpenStates / OpenCivicData bulk snapshot [2026-07-01](https://data.openstates.org/daily/2026-07-01/public.pgdump); origin `ocd-bill/1214a5e3-aba5-422b-99c2-834a97a95e78`. Confidence: reported (aggregated from official California legislature records).