5a13be122b
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
91 lines
6.6 KiB
Markdown
91 lines
6.6 KiB
Markdown
---
|
||
type: "Bill"
|
||
title: "Energy: renewable energy resources."
|
||
description: "(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a \"public goods charge.\" The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources."
|
||
jurisdiction: "us/states/ca"
|
||
legislature: "California Legislature"
|
||
session: "20112012 Special Session 1"
|
||
identifier: "SB 2"
|
||
citation: "California SB 2 (20112012 Special Session 1)"
|
||
classification: ["bill", "appropriation"]
|
||
subjects: ["Energy: renewable energy resources."]
|
||
status: "enacted"
|
||
primary_sponsors: ["Simitian"]
|
||
version_count: 4
|
||
action_count: 20
|
||
vote_count: 7
|
||
first_action: "2011-02-01"
|
||
last_action: "2011-04-12"
|
||
source: "openstates"
|
||
source_identifier: "ocd-bill/93a0143d-2505-4fcd-94e9-4ad08e5d383a"
|
||
source_url: "http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201120121SB2"
|
||
source_hash: "1faa613a7066d98e21f91be7c9a4902bbf183fd738d9a64a7cbb09aa9fde4ae3"
|
||
vintage: "2026-07-01"
|
||
source_snapshot: "https://data.openstates.org/daily/2026-07-01/public.pgdump"
|
||
retrieved_at: "2026-07-06"
|
||
confidence: "reported"
|
||
tags: ["legislation", "bill", "us-ca"]
|
||
---
|
||
|
||
# California SB 2 (20112012 Special Session 1) — Energy: renewable energy resources.
|
||
|
||
(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to require the state's 3 largest electrical corporations, Pacific Gas and Electric Company, San Diego Gas and Electric, and Southern California Edison, to identify a separate electrical rate component to fund programs that enhance system reliability and provide in-state benefits. This rate component is a nonbypassable element of local distribution and collected on the basis of usage. Existing PUC resolutions refer to the nonbypassable rate component as a "public goods charge." The public goods charge moneys are collected to support cost-effective energy efficiency and conservation activities, public interest research and development not adequately provided by competitive and regulated markets, and renewable energy resources.
|
||
|
||
## Version chain
|
||
|
||
The bill's text revisions, in order — the diff chain from filing to enrollment.
|
||
|
||
1. **02/01/11 - Introduced** (filed) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120121SB2&version=20111SB299INT)
|
||
2. **04/12/11 - Chaptered** (committee substitute) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120121SB2&version=20111SB297CHP)
|
||
3. **SB2** (committee substitute) — [source](http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201120121SB2)
|
||
4. **03/31/11 - Enrolled** (enrolled) — [source](https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201120121SB2&version=20111SB298ENR)
|
||
|
||
## Votes
|
||
|
||
- Do pass. — **12–3** (pass) · lower
|
||
- SB 2 Simitian Senate Third Reading By CHESBRO — **55–19** (pass) · lower
|
||
- 3rd Reading — **26–11** (pass) · upper
|
||
- Do pass. — **5–1** (pass) · upper
|
||
- Do pass and be re-referred to the Committee on Natural Resources. — **10–3** (pass) · lower
|
||
- Do pass and be re-referred to the Committee on Appropriations. — **6–3** (pass) · lower
|
||
- Do pass, but re-refer to the Committee on Appropriations. — **8–2** (pass) · upper
|
||
|
||
## Sponsors
|
||
|
||
- Simitian — primary (person)
|
||
- Bradford — coauthor (person)
|
||
- Chesbro — coauthor (person)
|
||
- Kehoe — author (person)
|
||
- Skinner — principal coauthor (person)
|
||
- Steinberg — author (person)
|
||
|
||
## Timeline
|
||
|
||
The legislative action history — every referral, reading, and vote.
|
||
|
||
- **2011-02-01** Introduced. Read first time. Referred to Com. on RLS. `referral-committee, introduction, reading-1`
|
||
- **2011-02-01** (Corrected March 29.)
|
||
- **2011-02-10** Re-referred to Com. on E. U. & C. `referral-committee`
|
||
- **2011-02-11** Set for hearing February 15.
|
||
- **2011-02-15** From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 2. Page 35.) (February 15). Re-referred to Com. on APPR. `referral-committee, committee-passage, committee-passage-favorable`
|
||
- **2011-02-19** Set for hearing February 23.
|
||
- **2011-02-23** From committee: Do pass. (Ayes 5. Noes 1. Page 42.) (February 23). `committee-passage, committee-passage-favorable`
|
||
- **2011-02-23** Read second time. Ordered to third reading. `reading-2, reading-1`
|
||
- **2011-02-24** Read third time. Passed. (Ayes 26. Noes 11. Page 44.) Ordered to the Assembly. `reading-3, reading-1, passage`
|
||
- **2011-02-24** In Assembly. Read first time. Held at Desk. `reading-1`
|
||
- **2011-02-28** Referred to Coms. on U. & C. and NAT. RES. `referral-committee`
|
||
- **2011-03-03** From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 10. Noes 3.) (March 3). Re-referred to Com. on NAT. RES. `referral-committee, committee-passage, committee-passage-favorable`
|
||
- **2011-03-08** From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 3.) (March 7). Re-referred to Com. on APPR. `referral-committee, committee-passage, committee-passage-favorable`
|
||
- **2011-03-14** From committee: Do pass. (Ayes 12. Noes 3.) (March 14). `committee-passage, committee-passage-favorable`
|
||
- **2011-03-15** Read second time. Ordered to third reading. `reading-2, reading-1`
|
||
- **2011-03-29** Read third time. Passed. (Ayes 55. Noes 19. Page 134.) Ordered to the Senate. `reading-3, reading-1, passage`
|
||
- **2011-03-29** In Senate. Ordered to engrossing and enrolling.
|
||
- **2011-04-04** Enrolled and presented to the Governor at 1 p.m.
|
||
- **2011-04-12** Approved by the Governor. `executive-signature`
|
||
- **2011-04-12** Chaptered by Secretary of State. Chapter 1, Statutes of 2011-12 First Extraordinary Session.
|
||
|
||
## Source
|
||
|
||
OpenStates / OpenCivicData bulk snapshot [2026-07-01](https://data.openstates.org/daily/2026-07-01/public.pgdump); origin `ocd-bill/93a0143d-2505-4fcd-94e9-4ad08e5d383a`. Confidence: reported (aggregated from official California legislature records).
|
||
|